Figure9
![A network flow approach for constellation planning](https://image.oaes.cc/c2cb5985-7f11-4ae6-925f-e388244833e2/4862-9.jpg)
Figure 9. The resulting utility score and computation cost from the scenario in Figure 8 using three satellites. The left image shows the edge length vs utility for the untrimmed, naively trimmed, and backbone trimmed graphs. The middle image is a zoomed in view of the left image. The right image shows the resulting computation time for the trimming.